mel Group was appointed to deliver specialist electrical refurbishment works as part of the extensive restoration of Provost’s Lodge at Eton College.
Client:
Project:
Service:
Building Type:
Sector:
Location:
mel Group Delivery Team:
Project Overview
As one of the most recognisable buildings within one of the UK’s most prestigious educational institutions, the project required a sensitive approach that balanced modern electrical infrastructure requirements with the preservation of the building’s historic character.
Working within a listed environment, our team was responsible for carefully removing outdated electrical systems and installing new infrastructure while protecting the fabric and heritage of the building throughout the refurbishment process.
The Challenge
Electrical refurbishment within listed buildings presents a unique set of challenges.
Unlike modern construction, historic properties often contain complex layouts, hidden voids, fragile building materials, and architectural features that must be preserved throughout the project. Every building has its own characteristics, requiring careful planning and a tailored approach to installation.
At Provost’s Lodge, maintaining the integrity of the building was just as important as delivering a safe and compliant electrical system.
The project required extensive coordination with the wider refurbishment team while ensuring all works were carried out with minimal impact on the historic structure.
Our Solution
Specialist Heritage Expertise
mel Group’s team has extensive experience delivering electrical works within historic and listed buildings across a range of sectors.
Our engineers understand the importance of preserving original features while integrating modern electrical systems that meet today’s safety and operational requirements.
Careful Planning & Preparation
Before installation works commenced, original floorboards were carefully removed and securely stored to protect the building’s historic features.
Temporary flooring systems were then installed to provide safe access for engineers while safeguarding the structure throughout the refurbishment process.
Electrical Strip-Out & First Fix Installation
The initial phase of the project involved isolating and removing outdated wiring systems before commencing first-fix electrical works.
This approach ensured that the new installation could be delivered safely, efficiently, and in line with current regulations while supporting the wider refurbishment programme.
Project Coordination
The project was supported by Approved Electrician Ryan Ward, who played a key role in both the delivery and coordination of the electrical works on site.
Regular progress meetings and close collaboration with other contractors ensured the programme remained on schedule and all works were carefully managed.
The Team Behind the Results
Project Highlights
- 1. Electrical refurbishment within a listed heritage building
- 2. Preservation-sensitive installation approach
- 3. Careful protection of original building features
- 4. Safe removal of existing electrical infrastructure
- 5. Coordinated delivery alongside wider refurbishment works
- 6. Experienced heritage electrical specialists
- 7. Project delivered in line with programme requirements
Results & Impact
The refurbishment of Provost’s Lodge demonstrates mel Group’s ability to successfully deliver electrical works within complex heritage environments.
Through careful planning, specialist expertise, and close coordination with the wider project team, the electrical works have progressed safely and efficiently while protecting the historic character of this prestigious building.
Projects such as Provost’s Lodge highlight the importance of combining technical excellence with an understanding of heritage conservation – an area where mel Group continues to support clients across educational, commercial, and historic estates.
From listed properties and heritage estates to complex commercial environments, mel Group provides electrical engineering solutions that combine technical expertise, compliance, and careful project delivery.
Need support with a refurbishment or heritage building project? Contact the mel Group team to discuss your requirements.
Project Gallery
Client Testimonial
I was hugely impressed by the courtesy, efficiency and punctuality of the chaps who did the job. If only all companies were so good.
Other Related Projects
Legoland Restaurant Lighting Upgrade
mel Group was appointed to design and deliver a lighting upgrade for The Bricks Restaurant within the LEGOLAND® Windsor Resort Hotel.
...Legoland Restaurant Lighting Upgrade
mel Group was appointed to design and deliver a lighting upgrade for The Bricks Restaurant within the LEGOLAND® Windsor Resort Hotel.
...
Meet The People Behind mel Group
Get to know the people who help deliver our projects, support our clients, and drive our continued success.